top of page
Abu Dhabi Skyline 2.webp

Integrated Operations Planning Lead – Abu Dhabi Public Transport Program

TMA-Global played a critical role in the planning and design of Abu Dhabi’s integrated public transport network, ensuring operational excellence across Metro, LRT/Tram, bus, water transport, and more. Our services included:
 

  • Simulation Validation: Evaluated operational simulations across all transport modes to ensure consistency, identify optimisations, and validate system feasibility.

  • O&M Strategy Development: Coordinated with design consultants to create integrated operations and maintenance strategies, optimising facilities, equipment, and shared resources across modes — with full consideration for phasing, expansion, and land requirements.

  • Interface Management: Oversaw the resolution of operational interfaces between transport modes to deliver seamless, passenger-friendly connectivity.

  • Integrated Control Centre Planning: Led the design of the Integrated Operations Control Centre, developing a unified control strategy, common equipment specifications, and shared backup systems to meet current and future needs.

  • Asset Management Strategy: Developed a proactive Asset Management Strategy to guide design, construction, and commissioning — ensuring smooth transition into operations and lifetime asset accessibility.

  • Recruitment and Training Strategy: Collaborated with the Department of Transport (DoT) to build a workforce development plan, embedding training and competency requirements into all future consultancy, design, and construction contracts.
     

Throughout the project, TMA-Global ensured operational integration, optimised resources, and aligned stakeholder objectives to help build a world-class, future-ready transport network for Abu Dhabi.

bottom of page